MISSION: Aerial Intelligence
Deploy precision drone surveys with centimeter-level accuracy. Generate orthomosaics, 3D models, and volumetric data in hours, not weeks.
What We Deploy For
Terrain Mapping
Generate high-resolution orthomosaic and DEM
Volume Calculation
Measure stockpile volumes with precision
Progress Tracking
Compare against baseline and detect changes
3D Model Generation
Create photogrammetric 3D mesh model
Recent Deployments
Al Riyadh Industrial Zone
- Excavation 12% ahead of schedule
- Material stockpile at 340m3
- No boundary encroachments
Jeddah Port Expansion
- Aggregate shortage detected
- Crane positioning optimized
- Safety perimeter verified
NEOM Construction Sector 4
- Terrain model generating...
- 32% data processed
- ETA: 2 hours
Survey Arsenal
Orthomosaic Generation
Create geo-referenced aerial maps with sub-centimeter accuracy
Digital Elevation Models
Generate precise terrain models for planning and analysis
Volumetric Analysis
Measure stockpiles, cut/fill calculations with engineering precision
Progress Monitoring
Compare surveys over time to track construction progress
operator Object Detection
Automatically identify equipment, vehicles, and workers
3D Model Export
Generate photorealistic 3D models for BIM integration
Mission Performance Metrics
Real-time analytics from our drone fleet
Ready to Launch Your Mission?
Deploy precision drone surveys and transform how you see your site.
Frequently Asked Questions
What is the difference between a drone survey and an aerial photograph?
An aerial photo is a single image from above. A drone survey is hundreds of overlapping photos processed via photogrammetry into a 3D point cloud, orthophoto (geo-referenced map), digital elevation model (DEM), and measurable 3D mesh. Surveys enable volume calculations, contour mapping, and BIM comparison — photos do not.
How long does a drone survey take for a typical construction site?
A 10-hectare site takes 30–45 minutes of flight time + 2–4 hours of processing. A 100-hectare site takes 3–4 hours of flight + 8–12 hours of processing. Same-day deliverables (orthophoto + rough point cloud) are standard; refined outputs (contour maps, volume reports) delivered within 24 hours.
Can drone surveys measure earthwork cut/fill volumes?
Yes, with high accuracy. Comparing two surveys (before and after excavation) yields cut/fill volumes accurate to ±2–3% when GCPs are used. This is the standard method for monthly earthwork progress claims. Reports are exportable as PDF or directly into earthwork accounting software.
What deliverables come with a drone site survey?
Standard deliverables: geo-referenced orthophoto (GeoTIFF/KMZ), 3D point cloud (.LAS/.LAZ), digital elevation model (.TIFF), contour map (DXF/PDF), and a 3D mesh (.OBJ/.FBX). Optional: BIM-ready IFC file, volume reports, comparison report vs. previous survey, and online web-viewer link.
Does ViewKeeper handle flight permits for restricted sites?
Yes. Permit acquisition is part of our service. For sites near airports, military zones, or critical infrastructure, we secure MOI/GACA approvals — typical timeline 7–14 business days. Pre-approved annual permits for recurring surveys reduce delays for long-term projects.